Điện thoại kinh doanh0984 694 266
0986 514 788
0399 507 000
Zhongxing delivers and installs nationwide from offices and warehouses in Ho Chi Minh City. For large projects, the technical team surveys the site beforehand for accurate layout and installation.
01Delivery scope
Nationwide delivery. Goods shipped from Zhongxing warehouse at 101E/3 Quarter 2, DT743 Street, An Phu Ward, Thuan An City, Ho Chi Minh City.
02Delivery time
| Order type | Region | Estimated time |
|---|---|---|
| In-stock items | Ho Chi Minh City | 1 – 3 days |
| In-stock items | Other provinces and cities | 3 – 7 days |
| Custom size and color orders | Nationwide | Quoted per order |
| Projects, high-density mobile shelving, warehouse racking | Nationwide | According to contract schedule |
Time is calculated from order confirmation. Zhongxing will call to schedule delivery before dispatch.
03Shipping fee
- Inner Ho Chi Minh City: free delivery based on order value, Zhongxing will provide details upon order confirmation.
- Other provinces and cities: calculated by volume and distance, quoted for customer approval before delivery.
- Project orders: shipping fees are clearly stated in the quotation or contract.
04Installation
- Free installation in Ho Chi Minh City.
- Filing cabinets and lockers are delivered fully assembled or disassembled depending on the model; technicians complete on-site assembly.
- High-density mobile shelving and warehouse racking: technical team surveys the site and takes measurements before production and installation.
- After installation, technicians provide instructions on using locks, rails, and hand wheels before handover.
05Inspection upon receipt
- ComparisonCheck quantity, product codes, and colors against the order.
- Visual inspectionCarefully check surfaces, edges, doors, and locks.
- Report immediatelyDents or scratches due to transport: report to delivery staff for replacement.
- Sign-offSign the delivery note when goods are correct and complete.
06Site preparation
- Notify in advance if the building has restricted delivery hours or requires freight elevator registration.
- Clear the location for cabinets or shelving; floors must be flat and dry.
- High-density mobile shelving: the floor must be level and have good load-bearing capacity for rail installation.






















